Product parameters
Raw Material:
Metal grade: Q235
Thickness: 2.five~four.0mm
Coil internal diameter:φ508~φ600
Coil out diameter: ≤φ1900
Coil excess weight: ≤10T
Computerized decoiler – Feeding – Leveling – Punching and slicing – Roll forming – Solution packing manually
The Construction of Equipment
Automatic expansion decoiler
1.CZPT unrolling machine,
2.Undertake computerized enlargement program, electricity 2.2kw
three.Optimum coil weight: ten,000kg,
four.inner diameter: 450-600mm, out diameter max 1900mm
5.with brake method.
Feeding & leveling
wall plate variety 9 rollers leveler, 2 roller feeding, 7 roller leveling. Leveling roller 120mm, material 40Cr, warmth treatment method HRC48º~52º. Four stand roller to handle sheet up and down movement. Electrical power: 11kw, inverter modifying, velocity: ten-25m/min, feeding width max 500mm.
Punching and chopping:
1.Use four column variety press from Yangli team, equip with punching and chopping die set, suit for nine or 10 holes. With 1 established of center hole punching, cylinder dia 160mm, touring length: 60mm
2.Cut to size by encoder: duration precision 4320±2.0mm, length can set in PLC.
three.Rapidly feeding unit: right after chopping, sheet feeding into roll forming unit, two.2kw, roller Dia: 120mm, substance 40Cr, HRC48º~52º.
Roll forming device
1.Principal motor power: 45kw
2.Travel: gearbox driving, 10units, GY230
3.Major shaft diameter: 80mm and 40Cr metal
4.Roller substance: GCR15 quenched 58°-62°, chromed
5.Roll station:12 stations
6.Pace: 2-3pieces for each moment (4320mm duration)
Output desk
Control panel
1.Manage technique
two.Voltage, frequency, section: 380v, 50hz, 3phase
three.Automated duration measurement: A single-unit tooling of duration measuring which is lightly pressed on the surface area of the metal sheet the tolling will roll with the relocating speed of the steel sheet and then perception to measure its length.
4.Computerized amount measurement
5.Computer utilized to control duration & quantity, machine will routinely lower to size and end when required quantity is accomplished
6.Length inaccuracy can be amended effortlessly
7.Manage panel: button-type switch, contact screen
eight.Device of duration: millimeter
9.Protection perform
ten.Motor above: Load security
11.Technique over: Current security
twelve.Brief circuit safety
e. Extra purpose
Screen overall duration made
Display complete quantity made
Exhibit forming pace
Merchandise show
CZPTer pay a visit to
Certifications
Organization info
Packaging & Transport
FAQ:
one.How to keep the device?
Answer: insert mechanical lubrication equipment to chain, bearing and reducing slide every thirty day period. Incorporate mechanical lubrication to the circumstance every single 50 % a year.
2. Do you sell only regular machines?
A: No, most of our machines are constructed in accordance to clients requirements, utilizing top brand name factors.
three.How a lot of workers to function the equipment?
A:Only 1-2 personnel.
four. What can you do if the machine damaged?
Our machine’s guarantee period of time is 12months,if the damaged parts cannot be fixed,we can send out the new areas to change the broken parts for cost-free,but you need spend the convey value by yourself.if in excess of guarantee period,we can for to remedy the problems via negotiation,and we provide the specialized support for the complete existence of the tools.
5.How can I trust you that machines pasted tests working prior to transport?
A: 1) We report the screening video clip for your reference. Or,
2) You should pay a visit to organization and test device if practical.