Part I: Product INTRODUCTION
one. Description: Mechanical tubing is a sort of steel tube commonly employed automotive industry, engineering location, as effectively as equipment elements. Typical specification of mechanical tubing is ASTM A519, masking carbon metal gardes and alloy steel grades.
two. Commodity: AISI 1045 Chilly drawn seamless mechanical tubing
three. CZPT specification: ASTM A519, BS6323-4, CZPT specification.
4. Offered steel grade: Different carbon steel and alloy steel grades including but not constrained to the adhering to:
ASTM A519: | SAE1571,SAE1571,SAE1026,SAE1045,SAE1518,SAE1524,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,SAE8620 |
BS 6323-4: | CFS3,CFS4,CFS5,CFS7,CFS8,CFS9,CFS10,CFS11 |
EN/DIN: | ST35,ST45,ST52,E195,E235,E355,C35E,C45E,25CrMo4,34CrMo4,42CrMo4, |
five. Dimension variety:
OD: | upto 356mm |
ID: | upto 300mm |
W.T: | not limited |
6. Manufacture approach: Cold rolled, Cold drawn, CZPT chilly drawn
seven. Shipping and delivery Problem:
BK | BKW | BKS | GBK | NBK | Q+T |
+C | +LC | +SR | +A | +N | |
Cold rolled | Chilly drawn | Tension relieved | Annealed | Normalized | Quenched+Tempered |
8. Conclude end: plain finishes with square cuts,bevelled finishes.
nine. CZPT export packing: in bundles tied with metal strips. Inside and external oil coating. Exterior packing by PVC baggage and knit luggage.
ten. CZPTized packing or marking are CZPT on request.
MECHANICAL TUBING WITH THICK WALL:
MECHANICAL TUBING WITH Quality 4140 Q+T:
MECHANICAL TUBING Without Heat Managing:
Component II: Often Asked Queries
one. MOQ: 3-5 tons/size for carbon metal grades, 10-twenty tons/measurement for alloy steel gardes.
two. Supply Time: 20-30 days for carbon steel mechanical tubings, 30-50 times for alloy steel mechanical tubings.
3. Warranty&Assure: Warranty&guarantee time period is 6 months considering that we produce the tubes, and we are not responsible for top quality problem triggered by incorrect unloading or storage soon after cargo. We welcome customer’s inspection ahead of cargo.
4. Payment Strategy: We take payment technique like T/T, L/C, or D/P, but it depends on our investigation about clients. We have a solution to assess the credit history of clients from all in excess of the world, and time and sum of D/P we can release is determined by the evaluation.
5. Quality Handle: We buy uncooked material from secure suppliers who are major steel mills, and we examine the uncooked materials as for each the specs. In the course of our production process, there is inspection and good quality handle in each and every phase.
Element III: Business INTRODUCTION
We are a manufacturer of cold drawn, chilly rolled, and hydraulic cold drawn metal tubes with OD upto 356mm because 2002. Covering an region of about 32000M2, we have 12 standard workshops with two hydraulic cold drawing benches, 4 chain chilly drawing benches, and two ERW mills. Our amenities addresses all the generation processes from pickling, cold drawing,warmth treating,saw reducing, straightening,inspection,packing to more machining &turning, cold drawing die fabrication, and tools repairation&maintenance.
Manufacturing unit Physical appearance:
Raw Substance Inventory:
Cold DRAWING DIE WAREHOUSE:
HYDRAULIC Cold DRAWING:
Warmth Managing FURNACE:
MULTI-ROLLER STRAIGHTENING:
STRAIGHTENING BY Push:
Observed Cutting: